Opens in a new tab

Parking Lot Paving

Get a Free Estimate

If you need parking lot paving in Athens, GA, you’re probably planning a new lot, adding spaces to the one you have, or replacing a lot that’s worn out. Each of those jobs starts in the same place, with the ground under the asphalt. We build the base and drainage for the cars and trucks that use your lot, so the surface holds up to them.

IB Paving is a locally owned company based in Athens, and we handle commercial paving across Northeast Georgia. We walk the lot with you, look at how traffic moves and where water goes, and then tell you what the job needs and what it doesn’t.

The IB Paving Difference

  • Built for Your Traffic: A doctor’s office and a distribution warehouse need different lots. We build the base for the heaviest vehicle that will use yours, and make it stronger where those vehicles turn and stop.
  • Drainage Planned Early: We set the slopes and drain locations before any asphalt goes down, so rain runs off instead of pooling in the spaces.
  • 30+ Years of Experience: Our owner has been paving for more than 30 years, and that experience goes into every estimate and every job.
  • Locally Owned and Operated: The same local company that gives you the estimate does the work.
Freshly paved commercial parking lot with paver and roller in Georgia

New Parking Lot Paving

A new lot starts with the ground. We clear the site and grade it so water runs toward the drains or off the edges. Before any stone goes down, the ground is checked for soft spots. A soft pocket left in place settles under traffic, and the pavement above it settles too, so it gets dug out and replaced with firm material. Then we build a compacted stone base and pave over it with hot asphalt.

Not every part of a lot carries the same load. Entrances, drive lanes, drive-throughs, and truck routes take the most weight, especially where vehicles turn and brake. Dumpster pads are some of the hardest-used pavement on a property, since a loaded garbage truck stops and lifts in the same spot every week. Those areas get a thicker build than the parking spaces.

Parking Lot Additions

When you run out of spaces, an addition gives you more room without tearing out the lot you already have.

The seam where new asphalt meets old is where a rushed addition fails first. We cut the edge of the existing pavement straight down to make a clean face, then coat it with tack, a thin layer of liquid asphalt that helps the new section bond to the old. The new section is built to the same height, so there’s no lip for tires or feet to catch.

An addition is also a good time to put in speed bumps or take care of parking lot repair on the existing side, since the crew and equipment are already on site.

Parking Lot Overlays

If your lot is worn on top but the base under it is still firm, a new layer of asphalt can go over it. That’s called an overlay, or asphalt resurfacing. First, cracks and broken spots in the old surface are repaired, and the surface is cleaned and tacked so the two layers bond. Along curbs and drains, asphalt milling grinds the old surface down, so the new layer meets them at the right height and water still drains.

An overlay won’t fix a failing base. If the lot is sinking or breaking up in many places, a new layer will crack in the same spots.

Full Parking Lot Replacement

When the base has failed across most of the lot, patches and overlays won’t hold. The usual signs are potholes in many areas, sunken sections, and water that sits after every rain. We take out the old asphalt, rebuild the base, correct the drainage, and pave the lot new.

If the damage is limited to a few areas, you may not need a full replacement. Parking lot repair can fix those sections and keep the rest of the lot in use.

How We Handle Parking Lot Paving

  1. Site Visit: We walk the lot with you, take measurements, and look at how cars and trucks move through it.
  2. Written Plan: You get a written estimate that covers the base work, the paving, and how the job will be phased.
  3. Prep: We remove old pavement where needed, grade the site so water drains off, and dig out any soft spots in the ground.
  4. Base: We spread crushed stone in layers and compact each one.
  5. Pave: We lay hot asphalt with a paver and roll it smooth and firm.
  6. Finish: We clean up the site and walk the lot with you before it reopens.
New asphalt parking lot with roller and crew outside a building

Parking Lot Paving FAQ

Can we keep part of our lot open?

Usually, yes. We can often pave in sections so customers and tenants still have somewhere to park.

How soon can cars park on a new lot?

Cars can usually park on it within a day or two. Heavy trucks should wait longer while the asphalt hardens.

Do you add speed bumps and lines?

Yes. We can build speed bumps into a new lot or an addition while the crew is on site. We also stripe lots, so the new lines and markings can go down once the asphalt is ready.

Will you handle the drainage, too?

Yes. Grading and slope are part of every lot we pave, because flat spots hold shallow puddles that seep into the surface and soften the base.

How do I protect a new lot?

Give it a few months to cure first. Sealing too early traps light oils that are still working out of fresh asphalt. After that, sealcoating slows the drying from sun and air and keeps water out. Sealing cracks while they’re small keeps water from reaching the base.

Ready to Get Started?

Call 706-710-4222 or fill out the form for a free, no-obligation estimate.

Free Estimate
Complete the form below for a free, no-obligation estimate.

Our Past Work

Free Estimate
Complete the form below for a free, no-obligation estimate.